Abstract

In this paper the problem of system-level reliability growth estimation using component-level failure data is studied. It is suggested that system failure data should be broken down into component, or subsystem, failure data when the above problems have occurred during the system testing phase. The proposed approach is especially useful when the system is not unchanged over the time, when some subsystems are improved more than others, or when the testing has been concentrated on different components at different time. These situations usually happen in practice and it may also be the case even if the system failure data is provided. Two sets of data are used to illustrate the simple approach; one is a set of component failure data for which all subsystems are available for testing at the same time and for the other set of data, the starting times are different for different subsystems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.