Abstract
To enhance system performance, corrective maintenance for failed components and preventive maintenance (PM) for operating components can be performed simultaneously on repairable systems. Due to limited budget, it is typically not practical to perform PM for all the operating system components. Moreover, different selections of components for PM can lead to significant differences in system performance improvements. This paper proposes an extended joint integrated importance measure (JIIM) to effectively guide the selection of PM components, aiming to maximize gains of the system performance. A multi-valued decision diagram (MDD) based method is then developed to evaluate the proposed JIIM for general repairable systems. The computational procedure of MDD and some properties of JIIM are illustrated with a numerical example of a system containing three components. A realistic application to the performance analysis of an aircraft warning system verifies the proposed method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.