Abstract

The conditions for economic motivation for cost-effective use of resources are a prime requirement if an organization needs to implement energy-saving technologies, regardless of its purpose and type of activity. Energy-saving methods must be applied both at the technical level, and the system (management) level. The basis of energy saving is the systematic implementation of a set of technical and technological measures, which should be preceded by the optimization of organizations’ energy consumption at the system level. The chapter uses a rank analysis to show the efficiency of approximating the electricity consumption at the units of mining enterprises. The interval estimation procedure allowed for the identification and grading the mining enterprise units, revealing those with the abnormal electricity consumption. The trend of time series of relative electricity consumption for each facility is calculated. The chapter uses the results of calculations containing the health index figures for electricity consumption to establish facilities that require a priority in-depth energy inspection. This chapter focuses on the development of a methodology for timely identification of priority units for an in-depth energy survey for the implementation of energy saving projects and increasing the efficiency of electricity use in mining enterprises as objects of technocenosis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.