Abstract

We address the bi-criterion optimization of batch scheduling problems with economic and environmental concerns. The economic objective is expressed in terms of productivity, which is the profit rate with respect to the makespan. The environmental objective is evaluated by means of environmental impact per functional unit based on the life cycle assessment methodology. The bi-criterion optimization model is solved with the ε-constraint method. Each instance is formulated as a mixed-integer linear fractional program (MILFP), which is a special class of non-convex mixed-integer nonlinear programs. In order to globally optimize the resulting MILFPs effectively, we employ the tailored reformulation-linearization method and Dinkelbach's algorithm. The optimal solutions lead to a Pareto frontier that reveals the tradeoff between productivity and environmental impact per functional unit. To illustrate the application, we present two case studies on the short-term scheduling of multiproduct and multipurpose batch plants.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.