Abstract

Introduction. The sustainable design system of a built-up area requires integration of many types of information and ensuring the constant involvement of users, community members and various specialists throughout a building’s life cycle. The holistic designing approach implies focusing on the functional relationship between different parts of a building or a building complex as a whole that increases the complexity of a project. The key principle underlying sustainable buildings is an integrated design process taking into account the principles of environmental safety.The present article focuses on the analysis of the managerial and organizational methodology used by the civil engineering professionals in the context of sustainable construction. The design, management and arrangement of a construction site for a building’s reconstruction or a large scale build-up within the urban area boundaries require the development of measures and solutions for the storage and use of toxic chemicals, allocating the places for hazardous wastes collection and disposal, wastewater treatment – the results of operation of a previous structure or a building complex. All these factors need appropriate monitoring, assessment of risks and measures of ecological recovery of a land plot, in cases when the original objects and territories change their functional designation and are rebuilt into objects having impact on the environment.Materials and Methods. The development of sustainable design principles for arranging a construction site of capital construction facility on the areas that were exposed to long-term impact during the previous buildings’ and structures’ operation requires working-out the algorithms, methodology for assessment and monitoring the environmental situation on a construction site. The implementation of the present solutions requires the analysis of the sources of pollution, the duration of exposure, the nature and degree of construction site’ soil layer pollution. The development of modern managerial, organisational and technological solutions will minimise the processes of territory recovery and create sustainable construction operations.Results. As a result of the conducted research there were developed: the algorithms for assessing the ecological state of a construction site soil layer, the recommendations on the methodology for a build-up area ecological state assessment and monitoring aimed at setting the sustainable design of the organisational and technological solutions within an investment and construction project.Discussion and Conclusions. The implementation of the sustainable design processes in the investment and construction project on a build-up area soil layer preservation, the monitoring and assessment of its state enable avoiding extra costs due to the absence of the need for soil reclamation and purchase of soil of a different chemical composition from that originally formed in a particular area, and due to ensuring maximum possible preservation of vegetation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.