Abstract

Cost prediction in early stages of construction projects is one of the crucial problems of project sustainability. Previous research has been aimed at process based and data driven model development by using various techniques, e.g. regression analysis, support vector machine (SVM), neural networks etc. According to the research results, neither of the techniques can be considered the best for all circumstances. Therefore, the research has been redirected towards hybrid modelling, i.e. combination of different techniques. In this research, for prediction of the target variable - real construction cost of road structures, available variables: contracted construction cost, contracted construction time and real construction time and cost, hybrid model - combination of SVM technique (data-driven model) and Bromilow time-cost model (TCM) (process-based model) have been used. Five hybrid models have been built for comparison purposes: SVM-Bromilow TCM, LR-Bromilow TCM, RBFNN-Bromilow TCM, MLP-Bromilow TCM and GRNN-Bromilow TCM, combining Bromilow TCM with SVM, LR (linear regression), RBFNN (radial basis function neural network), MLP (Multilayer perceptron) and GRNN (general regression neural network), respectively. The highest accuracy has been obtained with SVM-Bromilow TCM with mean absolute percentage error (MAPE) 1.01% and coefficient of determination (R2) 97.61%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.