Abstract

PurposeThe participatory method, a major factor for a successful post-disaster reconstruction (PDR) project, is applied in various stages of the PDR. However, the application of this method for PDR involving indigenous populations is underexplored. Therefore, this paper aims to analyze the critical factors that can influence the participatory PDR in the indigenous context.Design/methodology/approachTwo large-scale, indigenous, post-disaster relocation projects after the 2009 Typhoon Morakot were selected as case studies. The qualitative and quantitative methodology (semi-structured interview and questionnaire) were applied in the research.FindingsA participation-friendly policy, community organization, the extent of damage, flexibility of nongovernmental organizations, understanding of the participatory concept and mutual trust were found to be essential factors that profoundly influence participation in PDR projects.Originality/valueThis study contributes by providing guidelines for future participatory PDR projects, especially in the indigenous context.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.