Abstract

Development heading in thin seams is complicated by large volumes of conjointly cut adjacent rocks which are often very hard. It is expedient to to prepare a new longwall by driving one heading and to use the previous longwall as a ventilation or conveyor roadway. The technology of roadway recycling in thin seams during top-downward mining is already applied. The technology of roadway recycling in bottomupward mining (a ventilation roadway is recycled as a conveyor roadway) has never been applied in Russian mines. The authors illustrate feasibility of recycling of a lower level ventilation roadway as an upper level conveyor roadway in terms of Berezovskaya mine in Kuzbass. The engineering solutions and the support design for the roadway are substantiated, and the measures of reinforcement of the support to prevent rocks falls are provided. The study was performed jointly with RANK 2 LLC.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.