Abstract

In order to study the construction technology of the underground excavation station of Chongqing where the geological conditions of the surrounding rock are better, Li-jia-ping Station of Chongqing rail transit line 9 is selected as the engineering background. On the basis of the traditional double sidewall tunnel method, the middle column method is proposed. Through the numerical simulation analysis of the variation of the tunnel dome subsidence, the horizontal displacement of the surrounding rock, and the plasticity of the surrounding rock under the construction of the spacer column method, the result shows that the construction of the middle pillar can satisfy the vault of Li-jia-ping station according to the field monitoring measurement data. Subsidence and surface subsidence control requirements. The research results can provide references for the design and construction of subway stations with large cross-section excavation under similar conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.