Abstract

With the construction of smart grid and smart substation, influences of the main electrical connection on the reliability of the entire power gird have become more and more important. Therefore, coordinated development between power grid and substation is a key to the design and optimization of main electrical connection. In this paper, the entire equipment in power grid including the main electrical connection is simulated simultaneously, and then the index of power gird with the main electrical connection optimization by disconnecting circuit breaker is calculated. Optimization schemes are sorted by the method of TOPSIS, realizing the evaluation of main electrical connection based on coordinated development between power grid and substation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.