Abstract

A dynamic database based dynamic scheduling system is proposed. As the schedule is being preformed, the scheduling task data in the dynamic database is updated timely. Genetic algorithm (GA) is employed for generating optimized production plan quickly and easily in response to changes on the shop floor. The current status of the shop is considered while rescheduling, and new plan is used in conjunction with the existing schedule to improve the effeciency of flexible manufacturing systems. Simulation results demonstrate the effectiveness of the proposed system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.