Abstract
<p>The structure of cable-stayed bridge without back cable is a new breakthrough.In this paper, the cable adjustment process of linzhou yingbin bridge is studied. the whole bridge model is established using the finite element software MIDAS CIVIL.This paper compares the measured cable force with the designed cable force and gets range of cable force difference, The influence matrix method is used for the second cable adjustment to ensure that the stress and structural deformation in the process of cable adjustment are within the range of the design requirements.The cable force variation of the whole bridge is detected by dynamic measuring instrument to ensure the construction safety in the process of cable adjustment.</p><p> </p>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.