Abstract

Domestic sewage treatment plant is an important environmental unit in the city. The hydrolysis acidification process after the overhaul of the sewage treatment plant usually had a more than three-month’s slow started-up and run unstable, seriously affecting the daily operation and also existing big environmental risks. This paper mainly expounds the factors affecting rapid start-up such as the type of inoculating sludge, the amount of sludge, the hydraulic conditions and the bacteria start-up agent for hydrolytic acidifying bacteria. The start-up speed and operation effects of hydrolysis acidification process were improved by adjusting process parameters.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.