Abstract

The pre-cooling of a large LNG storage tank involves complex phenomena such as heat transfer, low-temperature flow, gas displacement, and vaporization. The whole pre-cooling process could take up to 50 h. For large-scale, full-capacity storage tanks, it is particularly important to accurately control the pre-cooling temperature. Digital twin technology can characterize and predict the full life cycle parameters from the beginning of pre-cooling development to the end and even the appearance of damage in real time. The construction of a digital twin platform requires a large number of data samples in order to predict the operating state of the device. Therefore, a simulation method with high computational efficiency for the pre-cooling process of LNG tanks is of great importance. In this paper, the mixture model and discrete phase model (DPM) are applied to simulate the pre-cooling process of a large LNG full-capacity tank. Following Euler–Lagrange, the DPM greatly simplifies the solution process. Compared with the experimental results, the maximum error of the DPM simulation results is less than 11%. Such a highly efficient simulation method for the large LNG full-capacity storage tank can make it possible to build the digital twin platform that needs hundreds of data model samples.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.