Abstract

This paper applied stopwatch to measure the work time of workstations on lamp assembling line. It studied issues effecting line production capability such as bottleneck workstations and superfluous capability. To overcome these shortcomings this paper suggests new line balancing schema. The schema includes reallocation of the work content, adjustment of the equipment and workers of each workstation. This improvement saves extra work shifts and reduces labor cost.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.