Abstract
This paper sets up a model of belt conveyor driven by two drive pulleys and three motors based on AMESim. The starting performance of conveyor is studied in three cases of motor starting interval: without time interval, with three second interval, and with five second interval. The conclusion is as following: the longer the time interval, the smaller the impact on the belt, and the acceleration of belt and gravity take-up. The simulation design suggests that three second interval and dual gravity take-ups should be taken. And the output torque of drive system should be reduced by 8—15%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.