Abstract

In view of the problem of mass concrete cracks during construction, the corresponding measures and methods are put forward. Generally speaking, the difference between the internal and external temperature and the basic difference of temperature are considered as the main factors influencing the phenomena. Under the FEM is adopted to simulate the stresses field of Inverted siphon during construction. Through analyzing the time-space variation law, it is fund that cracks easily appear. In the part of the middle line of the South-North Water Transfer Project£¬the quality of concrete surface of ¢ñsection in Jiaozuo has been improved obviously through the method of external insulation board, so it deserves to bepopularized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.