Abstract

The extradosed cable-stayed bridge is a new type of bridge developed in recent year. The optimization methods commonly used are based on the cable-stayed bridge and not entirely suit for the extradosed cable-stayed bridge. The paper puts forward a new optimization method, which applies the unknown coefficient functions aided by MIDAS/CIVIL, it takes the reasonable feasible range of dead moment solved by stress balanced method as the constraint condition, makes the square of unknown coefficients as objective function, and solves the cable force based on the effect matrix method thus to determine the cable force in reasonably completion state. This new method is verified with favorable effect, the internal force of this structure appear significant improvement. And finally, the results show better cable force obtained under the method in this paper compared with the cable force under other constraint conditions and objective functions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.