Abstract

Bus Rapid Transit was introduced as a flexible, low-cost alternative to Metro and Light-Rail systems which also aimed at encouraging people to opt for public transport instead of private vehicles. But due to the restriction of right-of-way in the existing road, implementation of BRT system has affected the other lanes. The Motorized vehicle lanes get congested and the total throughput in every direction is affected. Thus, the BRT system needs to be integrated with other modes of transport for optimization of the traffic situation as a whole. This paper presents a study in which the motorized vehicles are given passage into the BRT Lane at a appropriate distance before the intersection taking into account the traffic signal cycle and also the traffic signal used at entry spot of the BRT Lane. VISSIM, a microscopic simulation model is used to investigate the results of the above model and its effects on the traffic situation. It has been observed that if motorized vehicles are allowed on Bus lane at a distance from the intersection, there is an increase in number of vehicle-throughput, average speed, and reduction in average delay time and with minimal impact on the BRT system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.