Abstract
Traditional building engineering has a large amount of information and lacks communication among professions, so the construction management mode based on BIM becomes the key to engineering construction. According to the characteristics and shortages of the traditional building engineering, and based on the development of BIM technology and the basic idea of BIM 5D technology, As an example in teaching experiment complex building, it is feasible that construction optimization and dynamic management of construction process based on BIM 5D by the analysis of the model integration, construction segment division, schedule optimization, cost monitoring and quality racking. Finally, it summarized and analyzed the existing obstacles of BIM 5D in the process of technology application, and provided reference for the construction enterprises to promote the application of BIM technology.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: DEStech Transactions on Computer Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.