Abstract

Semarang–Demak Toll Road Construction with length ± 27 km, built for reduce traffic jam in Semarang. Due to road construction must pass area with very soft soil conditions/swamp land. Where type soil this is known have power support very low. For resolve problem the so structure Street use structure Slab on Pile. Structure Slab on Pile consist from slab, pile head and Pile Foundation              In analyzing the carrying capacity of piles analytically in this study, we used several methods such as the Meyerhof method, the Luciano Decourt method and the Schmertman method. Meanwhile, in our calendaring test, we used the Hilley method.On the Semarang–Demak Toll Road Development Project searching for comparison score power support ultimate Pile Foundation single by analytical with Calendaring data and PDA. Based on results calculation of value SPT data power support ultimate pile single on 44 m depth with method Mayerhof obtained 149.72 tons, for Luciano Decourt's method 210.0451 tons, Schmertman method 185,888 tons based on calculation Calendaring method Hilley 145,0251 tons and PDA obtained 148.73 tons.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.