Abstract

This The draft tube is one of the main load-bearing structure of the hydropower plant, The hydropower draft tube of Xiaoshankou is an underground space structure, mainly composed by the taper pipe segment, elbows segment and diffusion segment. This paper describe the structure design and calculation process of Xiaoshankou hydropower draft tube, including the draft tube load calculation, structural mechanics just Rigid panels calculate internal force calculation and reinforcement calculation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.