Abstract

This document is a structural analysis of the Flexible Receiver Platforms and the tank-pit wall during removal of equipment and during a accidental drop of that equipment. The platform and the pit walls must withstand a accidental drop of a mixer and transfer pumps in specific pits in tanks 102-AP and 104-AP. A mixer pump will be removed from riser 11 in pit 2A on tank 241-AP-102. A transfer pump will be removed from riser 13 in pit 2D on tank 241-AP-102 and another transfer pump will be removed from riser 3A in pit 4A on tank 241-AP-104.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.