Abstract

In this paper we look at the relative merits of two capacity utilization regimes in the merchant electricity transmission network: Must offer (Mo) where the entire capacity installed is made available for transmission and Non Must Offer (NMo) where some capacity could be withheld. We look at two specific cases: (i) Demand for transmission varies across time, and (ii) Vertical integration is allowed between investors in transmission network and electricity generators. In the case of time-varying demand under Mo, we find that a monopolist may underinvest in transmission when compared to NMo, although NMo may lead to more capacity withholding. In the case of vertical integration, we find that when the market power is with the generators of the exporting node, without vertical integration no welfare-enhancing merchant investment would occur. Further, if the generators in the importing node have market power, which of the two regimes is welfare enhancing depends on the parameter values. In case vertical integration is better, then Mo is better than NMo. Finally, we also argue that the incentive to collude among various transmission network investors is mitigated with Mo in place.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.