Abstract

Emergencies resulting in uncontrolled flow through spillway gates often lead to millions of dollars lost to repairs, lack of dam productivity, property damages, and risks to public health and safety. A considerable need exists for reliable emergency dewatering systems to prevent these consequences. Stop logs are the most commonly used dewatering system for spillway gates but are typically designed for maintenance purposes only. They have been found in most cases to be unreliable for emergency closure under flowing conditions. Considering the economic advantages a dewatering system would provide were it functional for the dual purposes of maintenance as well as emergency closure, a new stop log design was developed. This study assesses the design that enables deployment under no-flow conditions as well as flowing, or emergency conditions. The information found in this study provides dam owners, operators, and engineers with options to reduce damages resulting from uncontrolled releases owing to partial or complete failure of spillway gates, including the failure of gates to close after having been raised.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.