Abstract

Part I of this two-part paper introduced a building portfolio recovery model (BPRM) to forecast the stochastic recovery process of building portfolios within a community following an extreme hazard event. The BPRM models restoration of individual building-level functionalities as a discrete state, continuous time Markov Chain, while it models portfolio-level recovery by aggregating the building-level restoration processes in both temporal and spatial dimensions. In this paper, we illustrate the implementation of the BPRM to project the building portfolio recovery of a mid-size community following a predefined scenario earthquake. The recovery analysis integrates the engineering process of building reconstructions with available community resources and social-economic characteristics of different population groups. The spatial variations in recovery speed in different residential zones within the community reflect the disparities in resourcefulness and recoverability of homeowners with different social and economic status. In addition, sensitivity studies are performed to investigate the capability of the BPRM to quantify the impact of candidate pre-disaster mitigation strategies on the building portfolio recovery time and trajectory, illustrating the potential use of the BPRM in supporting risk-informed community resilience planning.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.