Abstract

In the present study, qualitative simulation model of reservoir and genetic algorithm optimization model were combined based on fuzzy logic to determine the trade off curve with stochastic quantitative and qualitative objectives. According to contradictory utilities of decision makers with respect to the obtained optimum trade off curve, a model of group conflict resolution was developed in order to determine the best point on the trade off curve from the perspective of decision makers. Using the outcome of conflict resolution model which was indicative of acceptable water quality for all decision makers, the optimization model was re-run, and time series of monthly water opeartion was determined for the agreed quality of beneficiaries. Finally, with the aim of formulating timely policies of operation of the reservoir, the use of probabilistic support vector machines that have the ability to create output possibilities was suggested. The proposed model was used for the operation of 15-Khordad Dam Reservoir, Iran. The results demonstrate the efficiency and accuracy of the fuzzy optimization model as well as the importance of using group conflict resolution model to provide the utility of decision makers in the operation of the reservoir.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.