Abstract

The determination of the reasonable thickness of the top layer of the large- diameter deep-hole stope is one of the important process parameters that must be considered in the high-stage mining recovery. The thickness of the top layer can ensure that the large-diameter deep-hole stope is not easy to collapse after the formation of the empty zone. To ensure the stability of the rock drilling chamber. According to the similar mine experience and mechanical model, the scientific and reasonable top-level safety thickness range is calculated. The three-dimensional numerical simulation of MIDAS/GTS is used to verify and optimize the stability of different top layer thicknesses. From the perspective of displacement and stress, comprehensive simulation analysis is carried out. After comprehensive comparison of angles, the optimal thickness of the top layer is determined to be 9 m.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.