Abstract
In this paper, we study the operational availability of a complex technical system consisting of several components. The components are subject to breakdowns, and hence for each component a limited number of spare parts are held in stock. If a system's component fails and it can not be replaced immediately, due to a lack of spares, the system becomes unavailable until a new component is installed. Failed components are disposed of and hence, to keep the spare parts stock at an appropriate level, new components have to be purchased. We assume that only a limited annual budget is available for procurement, while any further procurement requires a considerable lead time. We investigate at an aggregate level what budgets are needed to attain a target availability level for the system. In addition, we develop various operational strategies for spending the annual budget during each year. Numerical results indicate that the so-called Balance Focussed strategy provides the best results in terms of system availability as a function of time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.