Abstract

Severe corrosion led to an in-service failure of one of the six spouts on a recovery boiler at Cenibra. The failure resulted in a large amount of cooling water entering the boiler and contacting smelt around the spout opening, but fortunately no smelt-water explosion occurred. An extensive investigation was conducted to determine the causes of the spout failure. The failure was caused by insufficient cooling water flow to the smelt spout, which, in turn, was caused by a sequence of events that occurred after a general blackout of an electrical energy system at the mill. The experience has led to the development and placement of operating and maintenance procedures that ensure adequate cooling water flows to smelt spouts to prevent future failures.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.