Abstract
This work explores the allocation question of battery energy storage systems (BESS) in distribution systems for their voltage mitigation support in integrating high penetration solar photovoltaics (PV). A genetic algorithm (GA)-based bi-level optimization method is developed that reduces the voltage fluctuations caused by PV penetration through deploying BESS among permitted nodes of a distribution system while accounting for their capital, land-of-use and installation costs using a qualitative cost model. The optimization problem considers BESS capacity and installation points in the distribution system as decision variables. Each BESS operation is determined using a linear programming (LP) routine that minimizes the daily coincident peak demand. A comprehensive validation study is carried out through exhaustive enumeration with the IEEE 8500-Node test feeder showing that the proposed method results in consistent decisions that appear to be globally optimal. Further sensitivity studies are conducted to showcase the behavior of the method under varying sizing costs, siting costs and PV penetrations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.