Abstract

Purpose As the volume of international trade increased, the needs for large concrete caisson breakwaters, which can accommodate the bigger vessels, increased accordingly. However, due to the size of the caissons, the constructions of large-scale maritime infrastructures often face challenges about how to manage the construction site, improve the construction processes, and enhance productivity. Method This paper presents a methodology to optimize the caisson structure fabrication process by controlling the locations of construction equipment and prefabrication facilities using genetic algorithm (GA), coupled with the functions of a Delmia-platform. First, a virtual construction site layout is established with a set of required facilities and equipment on the Delmia-platform based on the spatial information of the construction site. Site layout constraints and requirements are then determined to properly reflect the nature and conditions of the projects. Lastly, a genetic algorithm is employed to find out the optimal construction site layout for the construction processes. Results & Discussion The proposed GA-based methodology is expected to assist construction engineers in determining optimized construction site layout for caisson structure prefabrication in the early project phase and further identifying the potential risks of projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.