Abstract
This paper studies the complexity of single-machine scheduling with an external resource, which is rented for a non-interrupted period. Jobs that need this external resource are executed only when the external resource is available. There is a cost associated with the scheduling of jobs and a cost associated with the duration of the renting period of the external resource. We look at four classes of problems with an external resource: a class of problems where the renting period is budgeted and the scheduling cost needs to be minimized, a class of problems where the scheduling cost is budgeted and the renting period needs to be minimized, a class of two-objective problems where both, the renting period and the scheduling cost, are to be minimized, and a class of problems where a linear combination of the scheduling cost and the renting period is minimized. We provide a thorough complexity analysis (NP-hardness proofs and (pseudo-)polynomial algorithms) for different members of these four classes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.