Abstract

The single machine batch scheduling problem is studied. The jobs in a batch are delivered to the customer together upon the completion time of the last job in the batch. The earliness of a job is defined as the difference between the delivery time of the batch to which it belongs and its completion time. The objective is to minimize the sum of the batch delivery and job earliness penalties. A relation between this problem and the parallel machine scheduling problem is identified. This enables the establishment of complexity results and algorithms for the former problem based on known results for the latter problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.