Abstract
In deteriorating job scheduling problems, most of the researchers assume that the actual job processing time is a function of its starting time. In this paper, we propose a new deterioration model in which the actual job processing time is a general function of the normal processing time of jobs already processed and its scheduled position at the same time. We show that some single-machine scheduling problems remain polynomially solvable.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.