Abstract
This paper considers a single-machine scheduling problem involving convex resource-dependent processing times and due-window assignment simultaneously. The goal is to minimise the total resource consumption cost under the constraint that the schedule cost involving earliness, tardiness, window location, window size and makespan does not exceed a given limit for two popular due window assignment methods: the common flow allowance (slack) due window assignment method (referred to SLKW) and the common due window assignment method (referred to CONW). We show that the problem can be solved in polynomial time. Some extensions of the problem are also given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.