Abstract

ABSTRACT The main objective of this study is to provide a practical and near-optimal mine production schedule for block caving operations considering operational uncertainty. The problem is defined in the context of goal programming optimization to meet the operational objectives, including tonnage and grade as daily production targets. The considered operational constraints include drawpoints and ore pass design, draw rate, mine production, and transportation capacities in different operational levels, tonnage and grade constraints, and mine production targets in the presence of several mining sectors. The developed model is verified and validated using historical operational data obtained from an actual block caving operation. The practicality and flexibility of the framework are examined through three different operational scenarios and compared with the real block caving operation mine plans and historical production data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.