Abstract

In this work, we present SCAPS-1D simulations of dual-junction tandem cells with chalcopyrite top subcells with various bandgaps (Eg=1.4, 1.5, 1.6, and 1.7eV) and a c-Si bottom subcell. The purpose of these simulations is to assess achievable device performances with a CIGS/c-Si tandem structure when a realistic efficiency of each subcell is applied. The top subcell conditions are simulated based on the state-of-the-art records, and the bottom c-Si cell is designed to have an efficiency of approximately 19%. When the Eg of the top chalcopyrite cell is below 1.5eV, the current matching condition between the top cell and bottom cell is not obtained until the top cell’s thickness is 0.2μm. However, with Eg values of the top chalcopyrite cells at 1.6eV and 1.7eV, the current matching conditions could be found. Nevertheless, because the efficiency from the top chalcopyrite cell is approximately 12%, it is predicted that the tandem structure exhibits a similar device performance to the bottom c-Si cell. This result suggests that improving the efficiency of the wide bandgap cell is essential for the tandem cell to overcome the efficiency form a single-junction solar cell.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.