Abstract

Abstract The development of high-rise building in china is described. The high-rise building fire risk analysis is introduced, and the high-rise structural fire accident in Shanghai is analyzed. Based on the plan of Shanghai high-rise building, in this paper a high-rise building which has the same plan in a city is selected to study the movement and evacuation of it using CFAST and Building EXODUS (V40.6). The purpose of the simulation is to study the advantage and weakness of this structural form of high-rise building.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.