Abstract
Background/Objectives: The intention of this simulation study is to inspect the effect of multi-level scheduling rules on the four different performance measures of proposed FMS (flexible manufacturing system). Methods/Statistical Analysis: Input data has been collected from the real existing system and proposed FMS simulation model has been developed using JAVA programming. Findings: The flow of parts through the system has been managed with multi-level scheduling rules related to launching of parts in to a system. The proposed simulation model has been modeled for the existing system and a common optimum part selection rule for the performance parameters such as MFT(mean flow time), make span, mean machine utilization, and mean Automated Guided Vehicle (AGV) utilization has been developed. Application/Improvements: Case study has been conducted on the existing system and the proposed simulation model has been created. The shortest processing time rule was found to be optimum upon comparing other two scheduling rules when output performance measures considered. The proposed simulation model aids in better scheduling of automobile and electronics applications.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.