Abstract

Xiaolan channel super large bridge is a stucture type adopted in the passenger dedicated railway line for the first time, and the longest span bridge of the passenger dedicated railway line, also the longest span bridge of the high-speed railway in the world with a total length of 7686.57m.. At first, the author compiles APDL command flow program by using the unit birth-death technique, establishes simulation calculation model in the construction process. The creep characteristics of concrete are also taken into account. The whole process of beam first-to-arch later stage construction are calculated and studied. Simulation Calculation and construction control research of Xiaolan channel super large bridge shows that construction control method is reasonable, the calculation program which is used in the paper is right, and using three dimensional substantiality finite element method and “element birth and death” to simulate construction process conform to reality. The bridge is safe in the construction of beam first and arch late.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.