Abstract

Dynamic pile testing and related data analysis methods are routinely used to measure soil resistance effects, estimate static pile load bearing capacity, and predict pile load-movement relationship. Analysis results represent conditions at the time of testing. For piles driven into soils with beneficial time-dependent characteristics, the capacity increases with time following the initial driving due to favorable geotechnical effects. In practice, construction scheduling constraints often restrict the evaluation of long-term pile capacity and limit the verification testing to a short period following initial driving. This paper presents a method for predicting future pile load-movement relationship based on end of driving and short-term restrike dynamic testing results. A case study is presented where field dynamic tests were performed with a Pile Driving Analyzer (PDA) and CAPWAP computer analysis during initial driving and restrike eleven days later. The CAPWAP method was also used to predict the pile load-movement graph expected at seventeen days after end of initial driving for comparison with results from a full-scale conventional static loading test to be independently performed at that time. Good correlation was obtained between the dynamically predicted and full-scale static load test results based on the proposed method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.