Abstract
The studies in Chap. 2 focus on the long-term (time-independent) risk evaluation of integrated electricity and gas systems (IEGS), where the steady gas flow model is utilized. However, the previous techniques can be not fully applicable for evaluating the short-term risk of IEGS on the operational horizon (Ding et al. in IEEE Transactions on Sustainable Energy 5:896–906, Jul 2014). Short-term risk is formulated on the time-scale of hours to days, during which the dynamics of gas flow are significantly slower than those of electricity flow.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.