Abstract
this paper we present an investigation for the short term (up 24 hours) load forecasting of the demand for the South Sulewesi's (Sulewesi Island - Indonesia) Power System, using a multiple linear regression (MLR) method. After a brief analytical discussion of the technique, the usage of polynomial terms and the steps to compose the MLR model will be explained. Report on implementation of MLR algorithm using commercially available tool such as Microsoft EXCEL <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">TM</sup> will also be discussed. As a case study, historical data consisting of hourly load demand and temperatures of South Sulawesi electrical system will be used, to forecast the short term load. The results will be presented and analysed potential for improvement using alternative methods is also discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.