Abstract

This paper deals with serial-batching scheduling problems with the effects of deterioration and learning, where time-dependent setup time is also considered. In the proposed scheduling models, all jobs are first partitioned into serial batches, and then all batches are processed on a single serial-batching machine. The actual job processing time is a function of its starting time and position. In addition, a setup time is required when a new batch is processed, and the setup time of the batches is time-dependent, i.e., it is a linear function of its starting time. Structural properties are derived for the problems of minimizing the makespan, the number of tardy jobs, and the maximum earliness. Then, three optimization algorithms are developed to solve them, respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.