Abstract

Scheduling is one of the important part in production planning process. One of the factor that influence the smooth production process is raw material supply. Sugarcane supply as the main raw material in the making of sugar is the most important componen. The algorithm that used in this study was Simulated Annealing (SA) algorithm. SA apability to accept the bad or no better solution within certain time distinguist it from another local search algorithm. Aim of this study was to implement the SA algorithm in scheduling the sugarcane harvest process so that the amount of sugarcane harvest not so differ from mill capacity of the factory. Data used in this study were 60 data from sugarcane farms that ready to cut and mill capacity 1660 tons. Sugarcane harvest process in 19 days producing 33043,76 tons used SA algorithm and 27089,47 tons from factory actual result. Based on few experiments, obtained sugarcane harvest average by SA algorithm was 1651,63 tons per day and factory actual result was 1354,47 tons. Result of harvest scheduling used SA algorithm showed not so differ average from mill capacity of factory. Truck uses scheduling by SA algorithm showed average 119 trucks per day while from factory actual result was 156 trucks. With the same harvest time, SA algorithm result was greater and the amount of used truck less than actual result of factory. Thus, can be concluded SA algorithm can make the scheduling of sugarcane harvest become more optimall compared to other methods applied by the factory nowdays.

Highlights

  • Scheduling is a process of allocating resources to select a set tasks within certain period [1]

  • The problems of scheduling can be solve by using exact and heuristics algorithm

  • The data used in this research was assessed by March SF Pangka Tegal period 2016-2017

Read more

Summary

Introduction

Scheduling is a process of allocating resources to select a set tasks within certain period [1]. Scheduling is one of the most important part of production planning process. The purpose of scheduling is to optimize the use of resources so that the goals can be achieved maximally. One of the purpose of scheduling process is to reduce the delayed time of a work [1]. Scheduling must be arranged systematically with the existing resources with effective and efficient so that the goals can be achieved maximally [2]. The problems of scheduling can be solve by using exact and heuristics algorithm. One of the heuristics algorithm is Simulated Annealing (SA)

Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.