Abstract

To utilize renewable energy systems (RES) as main generators in power system, power system operators need to maintain reserve power to compensate the uncertain output of RES, such as wind farms (WF). This paper focuses on the balancing group (BG) composed of WF and a pumped-storage hydro generator (PSHG). In the BG operation, power system operators need to schedule the operation of PSHG to minimize the imbalance risk caused by the prediction error of WF output while considering the system specific constraints of PSHG, e. g. the mechanical constraint on pump-up/down switching. This paper proposes a method to schedule the PSHG operation using the interval prediction results of the WF output for alleviating the imbalance risk the proposed scheduling scheme is formulated based on the linear programming. To verify the effectiveness of the proposed method, the amount of imbalance and the net generation of the BG were evaluated based on numerical experiments under two types of situations with different characteristics in WF output. The experimental results reveal the effectiveness of the proposed method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.