Abstract
Many existing mobile service robots, including the robots in Robocup@Home, perform their designated tasks only when the robots are stationary. The efficiency of these robots can be improved if they can perform some tasks while moving. In this paper, we propose the concept of mobile workstations, which combine mobile platforms with production machinery to increase efficiency by overlapping production time and delivery time. We present a model of mobile workstations and their jobs and describe the task planning algorithm for a team of mobile workstations. The temporal planning problem for mobile workstations combines both features of job shop scheduling problems (JSP) and traveling salesman problem (TSP), but there is little work in the literature that tackles both JSP and TSP simultaneously. Our first algorithm is a complete search algorithm which returns an optimal temporal plan with minimum makespan, and our second algorithm conducts a local search in the space of task graphs so as to quickly return suboptimal temporal plans. According to our experiments, when the number of jobs is small, our second algorithm can generate near-optimal temporal plans, and when the number of jobs is large, our algorithm can generate much shorter plans than SGPlan 5 and a version of job shop scheduling algorithms.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.