Abstract

In this paper, we discuss a scheduling problem for parallel batch machines where the jobs have ready times. Problems of this type can be found in semiconductor wafer fabrication facilities (wafer fabs). In addition, we consider precedence constraints among the jobs. Such constraints arise, for example, in scheduling subproblems of the shifting bottleneck heuristic when complex job shop scheduling problems are tackled. We use the total weighted tardiness as the performance measure to be optimized. Hence, the problem is NP-hard and we have to rely on heuristic solution approaches. We consider a variable neighborhood search (VNS) scheme and a greedy randomized adaptive search procedure (GRASP) to compute efficient solutions. We assess the performance of the two metaheuristics based on a large set of randomly generated problem instances and based on instances from the literature. The obtained computational results demonstrate that VNS is a very fast heuristic that quickly leads to high-quality solutions, whereas the GRASP is slightly outperformed by the VNS approach. However, the GRASP approach has the advantage that it can be parallelized in a more natural manner compared to VNS.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.