Abstract

Wafer sorting is one of the most critical processes involved in semiconductor device fabrication. This study addresses the wafer sorting scheduling problem (WSSP), with minimisation of total setup time as the primary criterion and minimisation of the number of testers used as the secondary criterion. In view of the strongly NP-hard nature of this problem, a simple and effective iterated greedy heuristic is presented. The performance of the proposed heuristic is empirically evaluated by 480 simulation instances based on the characteristics of a real wafer testing shop-floor. The experimental results show that the proposed heuristic is effective and efficient as compared to the state-of-art algorithms developed for the same problem. It is believed that this study has developed an approach that is easy to comprehend and satisfies the practical needs of wafer sorting.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.